Overview - About MRT Jakarta

about-MRT-1

Rail-based MRT Jakarta will stretch over ±110.8 km Jakarta roads, consists of South-North Corridor (Lebak Bulus – Kampung Bandan) of about 23,8 km and East-West Corridor of about 87 km.

• The construction of South-North Corridor that stretches along Lebak Bulus – Kampung Bandan will be carried out in 2 stages:

- Stage I will be carried out to connect Lebak Bulus with Bundaran HI over 15.7 km railway with 13 stations (7 elevated stations and 6 underground stations) which is targeted to operate by the end of 2016.

- Stage II will expand South-North Corridor from Bundaran HI to Kampung Bandan over 8.1 km railway, which construction will have been initiated before Stage I operates and is targeted to be completed on 2018 (from the earlier target of 2020). Feasibility study for this stage has been completed.

• A feasibility study is on progress for East-West Corridor, which is targeted to operate at the latest on 2024-2027.